WELCOME TO OREGON - NO SALES TAX

Restoration Service: Porsche 911 SWB Turn Signals & Tail Lights - Audette Collection ~ Porsche Lighting Restoration & BEST-IN-CLASS Porsche Parts
Restoration Service: Porsche 911 SWB Turn Signals & Tail Lights - Audette Collection ~ Porsche Lighting Restoration & BEST-IN-CLASS Porsche Parts
Restoration Service: Porsche 911 SWB Turn Signals & Tail Lights - Audette Collection ~ Porsche Lighting Restoration & BEST-IN-CLASS Porsche Parts
Restoration Service: Porsche 911 SWB Turn Signals & Tail Lights - Audette Collection ~ Porsche Lighting Restoration & BEST-IN-CLASS Porsche Parts

Restoration Service: Porsche 911 SWB Turn Signals & Tail Lights

Regular price
€658,95
Regular price
Sale price
€658,95
Unit price
per 
Availability
Sold Out or Not Available
Shipping calculated at checkout.

 

AN AUDETTE COLLECTION EXCLUSIVE

SWB signal light restoration is PhD level work for a restoration shop as they are very difficult to restore. The housings are made of poor quality pot medal making it difficult to re-chrome the trim edges without ruining the rest of the housing. The original reflectors inside the housing have to be removed and replated

We have solved the various issues over the past 15 years and we believe that our SW turn signal taillight restorations are Best-in-Class and it's a service that we’re proud to offer. 

Full Restoration
  • Housings – Original solid Porsche turn signal housings are used.
  • Housing exterior – Bead blasted. The exposed trim is triple chrome plated to a high standard.
  • Housing interior – Painted with a very high reflectivity rating is applied to the interior of the housings. 
  • Interior reflectors - Reflectors are removed and chrome plated and reinstalled with rivets.
  • Lenses – Premium high quality lenses from our Italian manufacturer
  • Bulb holders – New or reconditioned original bulb holders.
  • New bulbs using Fresnel #111 High Performance Bulb Kit, illumination increased by 45%
  • Correct new mounting screws using Type 316 Stainless Steel.

Project time 8-10 weeks.